Broadway Area Group's Mission Statement

The Broadway Area Group are committed to the rebuilding of Broadway Station and its operating Services, restoring it to its former Glory, and when operational, increase the profitability of the Gloucestershire Warwickshire Steam Railway, improve business opportunities for the Broadway Community and create a Heritage Railway experience for all to enjoy.




Presentations

  • Volunteer Recruitment
  • BAG Form Downloads

  • Sponsor a Platform 2 Slab Form
  • Friends of Broadway Station Application Form
  • Reference Document Downloads

  • Current CDM Regulations
  • Procedure Document Downloads

  • Current Working Practice Manual
  • Updates:-
  • Updated Index
  • Procedure 106 Recording of Buried Services
  • Procedure 103 Local Induction for New Volunteers
  • Technical Document Downloads - Signal Box

  • Signal Box general
  • Signal Box Sketch Data Sheet
  • Signal Box Calculation Data Sheet
  • Technical Document Downloads -Footbridge

  • Current Situation and Proposed Forward Action Plan as at 31st December 2014(latest)
  • Structure Design Diagram
  • Existing Stair Section
  • Existing Structure
  • Vertical Height Clearances
  • General Arrangement Drawing
  • Smoke Deflector Drawing
  • East Stairs
  • West Stairs
  • West & East Stair Support Details
  • E & W Tower Details
  • Tower Landing Details
  • Landing Step Details
  • Deck Remedial Work Sheet 1
  • Deck Remedial Work Sheet 2
  • Technical Document Downloads -Station

  • Station
  • Window and door frame brick detail
  • General brickwork detail
  • Wooden door Frames and widow Frames
  • JS proposed Station Canopy GA
  • JS Canopy Clearance
  • Broadway Station Interior Jan 2015
  • Technical Document Downloads - Waiting Room

  • Waiting Room
  • Disclaimer

    ---------------------Page last updated on 19 October 2014 -------------------------